Inwestor:MLEKPOL
Lokalizacja: Grajewo
Zakres prac: Construction of an anaerobic sludge treatment installation, gas engine installation and sewage sludge drying installation
Inwestor: PGE GiEK S.A. Power Plant Turów
Lokalizacja: Bogatynia
Zakres prac: Turnkey expansion of industrial wastewater treatment plants based on membrane microfiltration and reverse osmosis technologies as well as chemical precipitation of sulphates
Inwestor: Przedsiębiorstwo Usług Komunalnych Sp. z o.o.
Lokalizacja: Kolno
Zakres prac: Delivery, assembly and start-up of the ATAD installation
Inwestor: POLMLEK Sp. z o.o.
Lokalizacja: Lidzbark Warmiński
Zakres prac: Turnkey modernization of the wastewater treatment plant, including: preliminary wastewater treatment system, chemical pre-treatment system, biological reactor with auxiliary installations, cogeneration units, sludge dewatering unit and secondary sedimentation tank
Investor: ENEA Elektrownia Połaniec S.A.
Location: Połaniec
Scope of work: Design, supply, assembly and start-up of technological devices, including decanter centrifuges, lamella separator, hydrochloric acid dosing station and sodium hypochlorite dosing station.
Investor: Przedsiębiorstwo Energetyki Cieplnej - Gliwice Sp. z o.o.
Location: Gliwice
Scope of work: Implementation in the turnkey system of modernization of industrial wastewater treatment plants in order to adjust the quality of wastewater to the requirements contained in BAT conclusions based on technologies for the removal of heavy metals and sulfates, wastewater recarbonisation and final filtration.
Investor: Zielonogórskie Wodociągi i Kanalizacja Sp. z o.o.
Location: Zielona Góra
Scope of work:Delivery, assembly and commissioning of the Aerotherm hydrolysis installation and fat pasteurization installation for the Zielona Góra agglomeration
Investor: ANWIL S.A.
Location: Włocławek
Scope of work: Design, delivery of equipment and construction in the EPC formula of the water cooling system on the premises of ANWIL S.A. in Włocławek based on a cooling tower, pumping station, filtration processes and water conditioning.
Investor: Large chemical plant
Location: Poland
Scope of work: Design, supply and turnkey implementation of a water demineralization installation, including a new demineralized water station based on membrane technologies, a new ion-exchange water demineralization line and power supply for 6/0.4 kV transformers.
Investor: Zielonogórskie Wodociągi i Kanalizacja Sp. z o.o.
Location: Zielona Góra
Scope of work:Delivery, assembly and commissioning of the Aerotherm hydrolysis installation and fat pasteurization installation for the Zielona Góra agglomeration
Investor: Kleszczów Commune
Location: Kleszczów Commune
Scope of work: Expansion of the sewage treatment plant in Łękińsko together with the reconstruction of the sewage treatment plant in Kleszczów, construction of a sewage pressure pipeline from the sewage treatment plant in Kleszczów to the sewage treatment plant in Łękińsko and construction of a Selective Municipal Waste Collection Point.
Investor: MPWiK w m st. Warszawie S.A.
Location: Wieliszew
Scope of work: Construction of intermediate ozone and carbon filters installation with capacity adjusted to the current and forecasted production of the Northern Plant.